New subway line drilled through in Beijing
Share - WeChat

BEIJING -- The entire tunnel of Beijing Subway Line 17 was drilled through after the middle section of the tunnel was bored through on Monday, its builder China Railway 14th Bureau Group Corporation Limited announced.
Beijing Subway Line 17 is a major transportation artery that runs north to south in the Chinese capital, where about 21.9 million people live.
With a total length of 49.7 kilometers, Line 17 is designed to have 21 stations. The northern and southern sections of the line opened to traffic in 2023 and in 2021.
Once the entire line is operational in the future, it is expected to alleviate traffic pressure on Line 5 and Line 10.
- How's China's youngest scientific research station in Antarctica after one year of operation
- China's top procuratorate orders arrest of former national political advisor
- China adopts multiple measures as cold wave grips nation
- HKSAR government to file complaint with WTO against US tariff hikes
- Normal life restored at Xizang's post-quake resettlement sites
- Chinese scientists decode cold-tolerance mechanism in desert moss