home feedback about us  
  125-3-21  
CHINAGATE.WEST DEVELOPMENT.infrastructure    
    Key Issues  
 
  Sustainable development & environment  
  Industrial restructuring  
  Infrastructure  
  Market mechanism  
  Capital market  
  High-tech  
  Education & HR  
  Overseas Investment  
  Minority prosperity  
  East-west cooperation  
  Agriculture  
  Travel  
 
 
       
       
       
     
       
       
       
       
 
 
 
Three Gorges Dam begins to fill on schedule


2003-06-02
China Daily

China's Three Gorges Dam began to fill as its sluice gates started closing from 9 am on June 1.

The sluice gates at the dam in Yichang, Central China's Hubei Province, have begun blocking the flood-prone Yangtze River to form what will become a huge 600-kilometer-long reservoir.

The water level will rise from the current 100 meters to 135 meters by June 15. The water levels behind the dam will by then be 65 meters higher than those of the river downstream, laying the foundation for hydro-electric power generation.

The storing of water in the dam is a milestone in the development of the world's largest hydropower project, which will be completed in 2009.

Navigation on the Three Gorges section of the Yangtze River, which was prohibited for 52 days, will resume on June 16 as the permanent ship lock at the middle reaches of the Yangtze River begins trial operations. Larger ships will be able to traverse the dam to the river upstream.

Since construction began on the project in 1993, the multi-billion-dollar scheme has progressed on schedule, with phase two due for completion by the end of this year.

And two hydropower generating units, each with a capacity of 700,000 kilowatts, will start up in August. Another two will begin operating in October.

A total of 5.5 billion kilowatt-hours of electricity will be produced this year by the project.

The power will be delivered to energy-starved cities in Central and East China this year, including Shanghai and Wuhan, said Lu Youmei, president of the China Three Gorges Project Corp (CTGCC), which owns and is developing the scheme.

The project is due for completion in six years. Over the six years, the dam water level is expected to reach 175 meters and another 12 power generators will start work. By 2009, 26 power generating units will have a total capacity of 18.2 million kilowatts.

Lu said the project could come within its budget of 203.5 billion yuan (US$24.57 billion).

 

 
   
 
home feedback about us  
  Produced by www.yuzhongnet.com. All Rights Reserved
E-mail: webmaster@chinagate.com.cn
主站蜘蛛池模板: 91色资源网在线观看| 亚洲中文字幕无码久久2020| 色多多视频在线观看| 国产精品久久久久影视不卡| JAPANESE国产在线观看播放| 成人禁在线观看| 久久久国产精华液| 最近中文字幕在线中文视频 | 蜜桃丶麻豆91制片厂| 国产日韩中文字幕| 伊人性伊人情综合网| 在线欧美视频免费观看国产| а天堂中文最新一区二区三区| 放进去岳就不挣扎了| 久久人人爽爽人人爽人人片AV| 欧美18性精品| 亚洲性一级理论片在线观看| 浮生陌笔趣阁免费阅读| 免费人成视网站在线观看不卡| 经典国产乱子伦精品视频| 国产九九视频在线观看| 领导边摸边吃奶边做爽在线观看| 国产男女爽爽爽爽爽免费视频| **真实毛片免费观看| 国内xxxx乱子另类| 99久久无色码中文字幕人妻蜜柚| 天天狠天天透天干天天怕∴| www激情com| 好男人网官网在线观看| 一本伊大人香蕉高清在线观看| 成品煮伊在2021一二三久| 中文字幕看片在线a免费| 无码精品久久久天天影视| 久久久久成人精品无码| 日本护士xxxx视频| 久久久亚洲欧洲日产国码aⅴ| 日本特黄特色aaa大片免费| 久久国产欧美日韩精品| 日本边添边摸边做边爱边| 久久成人国产精品一区二区 | 黄色毛片免费看|