.contact us |.about us

Highlights ... ...
Search:
    Advertisement
Three phases of the Three Gorges Project
( 2003-07-01 17:31) (Chinadaily.com.cn)

Three Construction Phases

First phase, 1993-1997 (five years): Project preparation and first stage of construction, culminating in the damming of the Yangtze River in November 1997. The water of the Yangtze River was diverted through a man-made canal - the diversion channel, and the water level in the Three Gorges area rose by as much as 10 meters as a result.


Second phase, 1998-2003 (six years): The second stage culminates in the first batch of turbines beginning to generate hydropower and the permanent shiplock being put into operation. The reservoir is filled between June 1 and 15, 2003, when the water level in the Three Gorges have risen from the previous 66 meters above sea level to the current 135 meters.

TGP-Second Phase


Third phase
, 2004-2009 (six years): The project is to be completed in 2009, when all 26 generators will be operating. The water level will be raised to 156 meters in September 2006. At the completion of the project in 2009, the water level will reach 175 meters, referred to as the "normal pool level.
TGP Third Phase




   
Close  
  Go to Another Section  
     
 
 
     
  Article Tools  
     
  E-Mail This Article
Print Friendly Format
 
     
   
        .contact us |.about us
  Copyright By chinadaily.com.cn. All rights reserved  
主站蜘蛛池模板: 99国产精品欧美一区二区三区| 搞av.com| 无码h黄肉3d动漫在线观看| 女人18毛片a级毛片免费视频| 国产精品福利久久香蕉中文| 国产免费人人看大香伊| 俄罗斯乱理伦片在线观看| 亚洲V欧美V国产V在线观看| 中文字幕在线免费观看| 67pao强力打造高清免费| 英语老师解开裙子坐我腿中间| 激情综合网五月激情| 日本韩国中文字幕| 奇米影视77777| 国产国产人免费视频成69大陆| 免费在线观看黄网| 久久精品天天中文字幕人妻| a成人毛片免费观看| 香蕉视频免费在线| 波多野结衣在线不卡| 日本精品一区二区三区在线视频| 大香伊蕉国产av| 国产乱色在线观看| 亚洲欧洲日产国码无码久久99| 久久99国产精品久久99| 91成人试看福利体验区| 色一情一乱一伦一区二区三欧美 | 国产亚洲欧美在线视频| 亚洲国产精品sss在线观看AV| 中文字幕亚洲一区二区三区| 亚洲色图综合在线| 玩弄丰满少妇人妻视频| 抬头见喜全集免费版| 国产欧美一区二区精品久久久| 人妻少妇精品视频一区二区三区 | 国产成人三级视频在线观看播放| 狠狠色伊人亚洲综合网站色| 色国产精品一区在线观看| 欧美欧美欧美欧美| 女朋友韩国电影免费完整版| 国产三级在线看|