您現(xiàn)在的位置: Language Tips> Audio & Video> China Daily Media News  
 





 
Dam impact 'less than predicted'
[ 2007-11-22 11:32 ]

Download

The environmental impact of the Three Gorges Dam has been less than originally forecast, a senior project official said Wednesday.

Wang Xiaofeng, director of the Office of Three Gorges Project Construction Committee of the State Council, said: "The impact has not gone beyond the scope predicted in a 1991 feasibility report. In some aspects, it is not as severe as predicted."

Work on the 180 billion yuan ($22.5 billion) project on the middle reaches of the Yangtze River, which started in 1993, is expected to be completed by 2009.

To protect the environment, seven pilot projects have been designed to prevent pollutant discharge, improve biological diversity, and ensure drinking water quality in the area, said Wang.

The pilot projects in cities including Chongqing, Shanghai and Yichang, will also be completed by 2009, and involve the ministries of communications, agriculture and the State Environment and Protection Administration.

The committee is also setting up a monitoring system to evaluate environment protection work.

"We want to build not only a first-class hydropower project, but also a good environment," Wang told China Daily.

The project has had more positive, than negative, impact on the ecosystem, Wang said.

No major geological disaster has been reported in the reservoir area since the water level was raised to 156 meters last year.

Han Qiwei, a member of the Chinese Academy of Sciences, said the project is not to blame for some ecological problems in the Yangtze River that predate the building of the dam.

The project plays a key role in clean energy production and flood prevention, Han pointed out.

This summer, the dam was used for the first time in flood prevention, protecting the 60 million people in the lower reaches of the Yangtze from flooding, Wang Zhongfa, dean of the water resources department of Hubei Province, said.

The government has pumped in huge amounts of money to prevent geological and ecological disasters in the reservoir area, which used to witness frequent landslides before the dam was built.

Questions:

1.When is the project scheduled for completion?

2.When the dam was used for flood protection this summer, how many people were protected from floods?

3.Last year, the water level was raised. How high is it now?

Answers:

1.2009.

2.60 million.

3.156 meters.

(英語點(diǎn)津 Celene 編輯)

About the broadcaster:

Brendan is an Australian who has been involved in education and writing for over a decade. He has been published most recently for the Tiger Airways Inflight magazine, The Bangkok Post, The Taipei Times and Japan's Hiroshima Outside Magazine. He holds a Masters Degree in Community Development and Management and has resided in China for over 3 years.

 

 
 
相關(guān)文章 Related Stories
 

 

 

 
 

本頻道最新推薦

     
  Tibet hard hit by global warming
  China, India 'to hold joint exercise'
  Airport retail is potential 'gold mine'
  Growing number of female world leaders emerging
  《百萬美元寶貝》精講之一

論壇熱貼

     
  戀愛過程中的一些英語
  sugar crash?
  Have you gone batty?
  怎樣翻譯復(fù)雜的中文句子? (還有別的辦法)
  “房款的首期”英語怎么說
  “群租”一詞怎么翻譯




主站蜘蛛池模板: eeuss影院在线观看| 亚洲专区第一页| 色欲综合久久中文字幕网| 国产精品爽爽V在线观看无码| 一级做a爰片久久毛片免费看| 日韩欧国产精品一区综合无码| 亚洲毛片无码专区亚洲乱| 精品女同一区二区三区免费播放| 国产情侣一区二区三区| 69视频在线是免费观看| 女生张开腿给男生捅| 久久久www免费人成精品| 杨幂一级做a爰片性色毛片| 亚洲综合精品伊人久久| 美女一级一级毛片| 国产卡一卡二卡乱码三卡| 娇小性色xxxxx中文| 女人和拘做受口述| 中文字幕色婷婷在线视频| 暴力调教一区二区三区| 亚洲欧美另类久久久精品能播放的| 精品999久久久久久中文字幕| 国产一级淫片a| 麻豆文化传媒精品免费网站| 国产精品情侣呻吟对白视频| 99精品在线播放| 婷婷久久五月天| 中文字幕不卡在线观看| 日韩三级一区二区三区| 亚洲人成免费电影| 欧美精品亚洲精品日韩专区va | 一区二区三区在线播放| 日本一区二区三区四区| 久久青青草原亚洲av无码麻豆| 欧美国产激情二区三区| 亚洲熟妇av一区二区三区下载 | 玉蒲团之偷情宝典| 午夜亚洲av永久无码精品| 色之综合天天综合色天天棕色| 国产在线精品一区二区夜色| 日本三级韩国三级美三级91|